Preloader Close
UPT

Feasibility Study on the Relocation of Two Waterbodies within origins by Mahindra Chennai

Description & Brief scope
  • Feasibility study on catchment analysis of two waterbodies needs to be relocated within Mahindra industrial cluster without affecting its ecology and natural drainage system.
  • Efficient and effective management of Surface Water in order to optimize fresh water resource within the premises.
Key Highlights

Defunct status of the existing waterbodies will be proved and to suggest alternate location for shifting the waterbody to perform the similar role which was played the defunct waterbody.

Facts and Figures
Client

Mahindra Industrial Park Chennai Ltd.

Start Date

06-Jan-23

End Date

5 Months

Location

Thiruvallur, Tamil Nadu

Services

Relocation of Existing defunct waterbodies to an appropriate location