Preloader Close
UPT

Preparation of DPR for installation of on Grid Solar PV systems to achieve Net-Zero energy status for Madhavaram Mofussil Bus Terminus

Description & Brief scope

The study is to achieve the “Net Zero Carbon Emission Status” for MMBT bus terminus facility by offsetting the carbon emissions thro’ a renewable “On-grid Solar Power plant system”. The study / report aims to synergize the energy conservation opportunities, efficiency enhancement of the existing systems through on-grid solar power production to migrate towards “net zero carbon” status of the MMBT facility

Key Highlights

This study would assist the bus stand to achieve Net Zero status by the end of execution phase.

Facts and Figures
Client

CMDA

Start Date

29-Apr-22

End Date

12 Months

Location

Chennai, Tamil Nadu

Services

Preparation of DPR Assessment of power consumption and to pepare solar panel layout

Image Gallery: