The study is to achieve the “Net Zero Carbon Emission Status” for Kuthambakkam bus terminus facility by offsetting the carbon emissions thro’ a renewable “On-grid Solar Power plant system”. The study / report aims to synergize the energy conservation opportunities, efficiency enhancement of the existing systems through on-grid solar power production to migrate towards “net zero carbon” status of the Kuthambakkam facility.
This study would assist the bus stand to achieve Net Zero status by the end of execution phase.
CMDA
29-Apr-22
12 Months
Chennai, Tamil Nadu
Preparation of DPR Assessment of power consumption and to pepare solar panel layout