TPQMA FOR “C/O OF WORKERS’ HOSTEL (S+ 5) AT TANSIDCO INDUSTRIAL ESTATE, AMBATTUR, CHENNAI”
Read More
Report on Validation of Finished Ground Level of the proposed Royal Enfield Factory at Cheyyar SIP (Phase I).
M/S Royal Enfield had planned to construct a factory at Cheyyar SIPCOT Industrial Park in a plot which lies in the catchment of a lake named Nappan. CUBE was assigned to provide possible engineering solutions so as to prevent direct discharge of water from the factory premises and also ensure that there is no inundation in the factory premises.
A strategic approch to help tackle the inundation caused in the Nappan lake was studied.
Client : S.N. Pingle Consultants
Location : Thiruvannamalai, Tamil Nadu
Vertical : ENVIRONMENT AND SUSTAINABILITY
Services : Technical solution